Gold Coast

Hofco’s state of the art facility in Molendinar is responsible for the complete overhaul of many different types of down hole tools and oilfield equipment.

All workshop based servicing work is carried out utilising our comprehensive Quality Management System. Servicing procedures are designed from a merger of OEM specifications and repair manuals, T.H Hill DS1 inspection criteria and Hofco’s internal Quality and Assurance systems. The Gallagher Engineering Breakout Unit can make-up connections to 100,000 ft/lb’s and break- out connections to 150,000 ft/lb’s. The JDN Monocrane 5 Tonne gantry crane is utilised to safely handle any equipment as required.

Hofco Gold Coast

13 Production Avenue
Molendinar QLD 4214 Australia

Lorem ipsum dolor sit amet, consectetur adipiscing elit.